New-buck-corporation 91 User Manual

Browse online or download User Manual for Faxes New-buck-corporation 91. New Buck Corporation 91 User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 29
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Model 91 Bay Heater
Fireplace Insert & Freestanding
FEATURES
PREPARATION INSTALLATION
OPERATION MAINTENANCE SAFETY
Contact your insurance company for coverage and installation inspection
SAFETY NOTICE
If this heater is not properly installed, a house fire may result. For your safety, follow the installation
directions. Contact local building or fire officials about restrictions and installation inspection
requirements in your area.
This product is listed by Warnock-Hersey International, Inc. to the UL Standard No. 1482.
Manufactured by New Buck Corporation - Spruce Pine, NC 28777 - Revised 5/2001
PN-PI-9100660
Tested by ITS
Page view 0
1 2 3 4 5 6 ... 28 29

Summary of Contents

Page 1 - Model 91 Bay Heater

Model 91 Bay Heater Fireplace Insert & Freestanding FEATURES PREPARATION INSTALLATION OPERATION MAINTENANCE SAFETY Contact yo

Page 2 - TABLE OF CONTENTS

REQUIRED FIREPLACE DIMENSIONS Minimum fireplace dimensions: Height Width Depth

Page 3

POSITIONING THE HEATER When positioning the heater, the following conditions MUST be met! (See Figure 2.) 1. The front of the damper opening must b

Page 4 - SECTION I

7. Slide the unit back into the fireplace. Check to be sure that the trim panels are properly positioned and lie flat against the front of the firep

Page 5 - EPA COMPLIANCE STATUS

SECTION III RESIDENTIAL FREESTANDING ROOM HEATER INSTALLATION INSTALLATION PRECAUTION Extensive field and laboratory testing h

Page 6 - PROPER FUEL SELECTION

MODEL 91 BAY MINIMUM CLEARANCES The New Buck Corporation Model 91 Bay must be installed in compliance with the instructions contained in this manual

Page 7 - ASH REMOVAL

PREPARING THE STOVE FOR INSTALLATION 1. Inspect the unit for any obvious physical damage. 2. Plug the power cord into a 115V AC outlet. Set switch t

Page 8 - SECTION II

CLOSE CLEARANCE INSTALLATIONS (in inches) Close clearance installation is possible by using the following brands of black, double-wall chimney pipe. (

Page 9

thimble meets the NFPA-211 Code and local building codes and is a minimum of 18" from the ceiling. If the connector thimble does not meet these

Page 10 - MINIMUM CLEARANCES:

Example: The rear clearance for the Model 91 from page 12 is 18". (See Figure 1.) This clearance may be reduced by 50% to 9" by using eith

Page 11 - MOUNTING THE TRIM PANELS

Tested and Listed Wall Protector Clearances to combustibles may be reduced if a tested and listed wall protector is installed over a combustible sur

Page 12 - FINAL CHECK

TABLE OF CONTENTS SECTION I Room Heater Features...

Page 13 - SECTION III

SECTION IV WOOD HEATER SAFETY Certain safety hazards are inherent in any wood heater installation. You should be aware of these so that a safe and

Page 14 - MINIMUM CLEARANCES

SECTION V OPERATION This section of the manual is to help you get maximum efficiency and maximum smoke (particulate) reduction from your heater. If

Page 15 - CHIMNEY

BUILDING A FIRE: 1. Place the “Manual/Off/Automatic” switch in the “Automatic” (bottom) position for thermostat control operation. Turn rheostat kn

Page 16 - Single Wall Pipe)

SECTION VI PREVENTIVE MAINTENANCE / PARTS REPLACEMENT THE CATALYSTS The catalysts in your stove are designed for many years of use. If after severa

Page 17 - (Using Single Wall Pipe)

8. Cleaning the catalyst with plain water can reduce build-up of the catalyst-retarding chemicals. Nothing but a soft brush, low pressure air or pla

Page 18 - 1"

MOTOR ASSEMBLY REPLACEMENT (Motor, Thermostat, Rheostat, Wiring Harness) 1. Unplug the heater from the 115V AC outlet. 2. To replace the motor y

Page 19

OFF AUTO/MAIN SWITCH WIRING SCHEMATIC

Page 20 - SECTION IV

SECTION VII TROUBLESHOOTING Operation of any wood heater can create problems. While the use of a catalytic-combustor equipped stove will substantia

Page 21 - SECTION V

3. Backpuffing 4. Smoke Rollout when Heater Door is Opened 5. Low Catalytic Temperature COMBUSTOR-RELATED PROBLEMS 1. Plugging

Page 22 - BURN RATES

NEW BUCK CORPORATION (NBC) “LIMITED WARRANTY” FOR NBC RELATED PRODUCTS PLEASE READ THIS WARRANTY CAREFULLY PRODUCTS COVERED This warranty covers

Page 24

SECTION I The New Buck Corporation room heater Model 91 Bay is one of the safest and most efficient heating systems available when installed and opera

Page 25 - MOTOR ASSEMBLY REPLACEMENT

EPA COMPLIANCE STATUS This manual describes the installation and operation of the New Buck Corporation Model 91 Bay wood heater. These heaters meet t

Page 26 - AUTO/MAIN

CATALYST EQUIPPED This wood heater contains a catalytic combustor, which needs periodic inspection and replacement for proper operation. It is agains

Page 27 - SECTION VII

CATALYST MONITORING It is important to periodically monitor the operation of the catalytic combustor to ensure that it is functioning properly, and t

Page 28

SECTION II MASONRY INSERT INSTALLATION INSTALLATION OPTIONS This unit (appliance) may be installed into an all masonry fireplace, built in accordance

Page 29

FIGURE 1 FIREPLACE INSERT 30" 20" 15" 20" 8" 24" HEARTH EXTENSION MANTEL INSTALLATION (Fire

Comments to this Manuals

No comments